001

Vesta Apartments

A mixed-tenure scheme of 137, one, two and three bedroom apartments built opposite Cambridge railway station. The green development, which prioritised cycling and public transport over car use, included 29 homes for affordable rent and 29 more for shared ownership; the remaining 79 apartments were sold by Hill Partnerships.

Address: Tension Road (Off Station Road), Cambridge, CB1 2FB

Main Contractor: Hill Partnerships Ltd

Project Value: £370,000

Duration: Jul'15 - Jun'16

Services:

SFS (310m2)
CEP Petarch (370m2)
Alucobond Plus (290m2)
PPC aluminum profiles
vesta-apartments-FCS

002

Pentland Field School

Phased design & build project comprising extensive refurbishment works to classrooms & sports hall, construction of teaching block & linkway along with external landscaping at Pentland Field School; A specialist facility that focuses on teaching pupils aged between 4-19 years with Special Education Needs.

Address: Pentland Way, Ickenham, UB10 8TS

Main Contractor: T&B Contractors Ltd

Project Value: £227,000

Duration: Feb’16 – Sep’16

Services:

SFS (650m2)
Equitone Natura (390m2)
Cedral Weatherboard (75m2)
Trespa Meteon (110m2)
Envirograf cavity fire barrier
PPC aluminum profiles
Pentland-Field-School-FCS

003

Bowes Road (NCR Site 6)

Address: 98-118 Bowes Road, London, N13 4NP

Main Contractor: Allenbuild Ltd

Project Value: £755,000

Duration: Aug’16 – Jun’17

Services:

Alucobond Plus (2,200m2)
Envirograf cavity fire barrier
PPC aluminum profiles
Bowes-Road-FCS

004

Stamford Hill

Stamford Hill is a selection of one, two, three and four bedroom apartments, each finished to a high specification. Many of the apartments have a private balcony or terrace, with a focus on maximising light and views for all.

Address: 65-67 Stamford Hill, London, N16 5TJ

Main Contractor: Hill Partnerships Ltd

Project Value: £940,000

Duration: Sep’16 – Jan’18

Services:

Keratwin K20 terracotta tiles
Envirograf cavity fire barrier
PPC aluminum profiles
fcs-Stamford-Hill

005

Grange Walk

Address: Limasol Street, Bermonsey, London, SE16 3GA

Main Contractor: United Living (South) Ltd

Project Value: £1,100,000

Duration: Jan’19 – Nov’19

Services:

Removal of Euroclad ACM (Larson) and Celotex phenolic foam insulation
Recladding with; Genius Facades PPC aluminum Prime system (2,200m2)
PPC aluminum soffit system (880m2)
Rockwool Duo-slab insulation
Siderise cavity fire barrier
Grange-Walk-FCS

006

Mount Pleasant Halls

The project was led by Howard Osborne LLP in partnership with St Edmund’s College and L&G. Mount Pleasant Halls provides 277 modern, purpose-built rooms for students and academic staff at St Edmund’s College. The ensuite bedrooms and studio flats were constructed on the site of Mount Pleasant House, a former 1970s office block in the north of the city, demolished at the end of 2017.

Address: Mount Pleasant Halls, Mount Pleasant, Cambridge, CB3 0BL

Main Contractor: Geoffrey Osborne Ltd

Project Value: £155,000

Duration: Mar’19 – Jul’19

Services:

Fundermax Max Compact (525m2)
Siderise cavity fire barrier
PPC aluminum profiles
Mount-Pleasant-Halls-FCS

007

Bridge House

A £20 million design and build development comprising of 70 apartments and 5 maisonettes across 3 residential blocks for the London Borough of Hackney. Offering a mixed tenure of social rental, shared ownership and private for sale units.

Address: Shepherds Lane, Homerton, London, E9 6JL

Main Contractor: Mulalley & Co. Ltd

Project Value: £275,000

Duration: Aug’19 – Jan’20

Services:

TATA Steel – Colourcoat Urban roofing system (200m2)
Alucobond A2 (330m2)
Siderise cavity fire barrier
PPC aluminum profiles
Bridge-House-FCS

008

The Ridgeway

Address: The Ridgeway, Sele Farm, Hertford, SG14 2JZ

Main Contractor: United Living (South) Ltd

Project Value: £890,000

Duration: Jan’18 – May’19

Services:

Equitone Tectiva (940m2)
ACS Fastclad Brickslips (660m2)
Guttercrest PPC aluminum soffit system (490m2)
Siderise cavity fire barrier
PPC aluminum profiles
The-Ridgeway-FCS

009

Finchley Road

This development is located in close proximity to Golders Green and Hampstead Heath.  The development contains 31 apartments, a retail store and underground parking in a prominent corner position. The development comprises of five homes for affordable rent, six shared ownership and 20 homes for private sale.

Address: Goldfinch Court, 713 Finchley Road, Childs Hill, London, NW11 8AT

Main Contractor: Hill Partnerships Ltd

Project Value: £605,000

Duration: Dec’19 – Ongoing

Services:

Removal of Alucobond Plus and Kingspan phenolic foam insulation
Recladding with; Genius Facades PPC aluminum flat panel system (810m2)
PPC aluminum soffit system (220m2)
Rockwool Duo-slab insulation
Siderise cavity fire barrier
finchley-road-FCS